A 150 m² commercial fit-out in a working JLT tower, delivered in twelve weeks around neighbours who never stopped trading.

Platinum Tower, JLT, Dubai · Building management · DDA fit-out permit
01 — Area
150 m²
02 — Programme
12 weeks
03 — Type
Office
04 — Handover
Dec 2025
AD Tyres commercial fit-out in Platinum Tower, JLT
Shell & core to handover

Before & after

Same viewpoint, photographed at shell and at handover. Drag the handle — this is the distance covered, and the programme it took.

AD Tyres after fit-out
AD Tyres before works, at shell
BeforeAfter
AD Tyres150 m² · 12 weeks
The project

How it was built

What the brief asked for, what the building demanded, and what was handed over.

The brief

A 150 m² commercial fit-out in Platinum Tower, JLT: design, fit-out and MEP, combining a customer-facing front with working space behind it.

The constraint

Twelve weeks in a building that never stopped trading. In Jumeirah Lakes Towers the fit-out route runs through DMCC as well as building management, and the tower sets the hours for noisy work, the lift bookings and the delivery windows.

Customer-facing space and working space have opposite requirements: one is specified for how it looks and how sound carries, the other for durability under daily traffic. Drawing them to one finish schedule is how commercial units look tired within a year.

The result

Handed over in December 2025. The shell-to-handover frames above are the same viewpoints before and after.

On site

The rest of the room

Photographs from handover. Click any frame to open it full size.

Delivered under one contract

What the work included

Offices in towers rarely stop trading during works. The programme is built around the neighbours: noisy trades in agreed windows, deliveries in booked slots, protection down before the first tool comes out.

Partitions and ceilings

Glazed and solid partitions, acoustic ratings where the lease demands them, suspended and exposed ceiling systems.

MEP and data

HVAC modification, power, lighting, structured cabling and containment — coordinated so the ceiling closes once.

Acoustics

Absorption where meetings happen, isolation where they must not be heard. Specified, not decorated.

Joinery

Reception, storage walls, workstations and tea points built to drawing.

Approvals

Building management submission, method statements, permits to work, lift and loading bookings.

See offices fit-out

Your project could be next.

Send the drawings, or just the address — a site visit follows within 24 hours.