Solvu Solutions

A 95 m² office fit-out in eight weeks — our fastest office handover, with a full-height elevation over the JLT lakes.

Platinum Tower, Mazaya Business Avenue, JLT, Dubai · Building management · DDA fit-out permit
01 — Area
95 m²
02 — Programme
8 weeks
03 — Type
Office
04 — Handover
Aug 2024
Solvu Solutions office fit-out in Platinum Tower, JLT
Shell & core to handover

Before & after

Same viewpoint, photographed at shell and at handover. Drag the handle — this is the distance covered, and the programme it took.

Solvu Solutions after fit-out
Solvu Solutions before works, at shell
BeforeAfter
Solvu Solutions95 m² · 8 weeks
The project

How it was built

What the brief asked for, what the building demanded, and what was handed over.

The brief

A 95 m² office fit-out in Platinum Tower on Mazaya Business Avenue, with a full-height glazed elevation over the JLT lakes: reception and lounge, open plan, a boardroom, and slatted timber screens dividing the floor without closing the view down.

The constraint

Eight weeks — our fastest office handover. On a programme that short there is no recovery week: approvals, long-lead joinery and ceiling coordination all run in parallel rather than in sequence.

A tower elevation of that size also decides the layout. Meeting rooms against glass need acoustic treatment that does not read as padding, and the FCU and lighting layouts follow the partitions rather than the base-build grid.

The result

Handed over in August 2024, in eight weeks.

On site

The rest of the room

Photographs from handover. Click any frame to open it full size.

Delivered under one contract

What the work included

Offices in towers rarely stop trading during works. The programme is built around the neighbours: noisy trades in agreed windows, deliveries in booked slots, protection down before the first tool comes out.

Partitions and ceilings

Glazed and solid partitions, acoustic ratings where the lease demands them, suspended and exposed ceiling systems.

MEP and data

HVAC modification, power, lighting, structured cabling and containment — coordinated so the ceiling closes once.

Acoustics

Absorption where meetings happen, isolation where they must not be heard. Specified, not decorated.

Joinery

Reception, storage walls, workstations and tea points built to drawing.

Approvals

Building management submission, method statements, permits to work, lift and loading bookings.

See offices fit-out

Your project could be next.

Send the drawings, or just the address — a site visit follows within 24 hours.

Message us on WhatsApp